The main business of the company is: bladder accumulator, Diaphragm accumulator, Piston Type Accumulator, oxygen cylinder, CO2 cylinder, gas cylinder, nitrogen gas cylinder, Welcome to inquire and negotiate cooperation by phone.
About    |    Contact

News

Notes on assembly of accumulator

Assembling an accumulator requires careful attention to detail and adherence to specific procedures to ensure safety and optimal performance. Here are important notes to consider when assembling an accumulator:

  1. Preparation:
    • Before assembly, gather all necessary components and ensure that they are clean, free from damage, and compatible with the hydraulic fluid and system pressure requirements.
    • Verify that all seals, O-rings, and other sealing components are in good condition and appropriate for the application.
  2. Safety Precautions:
    • Wear appropriate personal protective equipment, including gloves and eye protection, when handling hydraulic components.
    • Ensure that the accumulator and all associated parts are depressurized before beginning assembly to prevent accidental discharge of pressurized fluid.
  3. Follow Manufacturer’s Instructions:
    • Refer to the manufacturer’s assembly instructions, technical specifications, and recommended torque values for all fittings and connections.
    • Use the correct tools and equipment specified by the manufacturer to assemble the accumulator safely and effectively.
  4. Assembly Steps:
    • Clean all parts thoroughly before assembly to remove dirt, debris, or contaminants.
    • Assemble the bladder, piston, or diaphragm into the accumulator housing according to the manufacturer’s instructions.
    • Install and tighten fittings, connections, and fasteners to the recommended torque values to ensure proper sealing and prevent leaks.
    • Pay special attention to the orientation and alignment of components to ensure proper operation and performance.
  5. Sealing and Testing:
    • Apply hydraulic fluid or compatible lubricant to seals and O-rings to facilitate assembly and ensure proper sealing.
    • Conduct a pressure test on the assembled accumulator to verify that there are no leaks and that the accumulator can hold pressure safely within its specified limits.
    • Monitor the accumulator for any signs of leakage or abnormal operation during and after assembly.

By following these notes and guidelines, you can effectively assemble an accumulator and integrate it into a hydraulic system with confidence in its performance and safety.

Prev:

Next:

Leave a Reply